A publicly funded skills academy, through its industry body

A national careers platform, decided by 1.29 marks with no challenge

A publicly funded skills academy needed a national careers platform, procured through its industry body as contracting authority. Bidable ran the competition in about 14 weeks from engagement to audit report.

The brief

A publicly funded skills academy needed a national careers platform for its sector. Its industry body ran the competition as contracting authority, with Bidable delivering it end to end.

What Bidable did

  • Strategy: the Open Procedure, threshold and CPV coding under S.I. No. 284 of 2016; award criteria A to F with minimum thresholds; a written programme agreed before drafting began. Green Public Procurement was considered at strategy stage and the outcome recorded.
  • Market engagement: Bidable’s knowledge of the digital-platform market set the academy’s expectations of what suppliers could offer, in place of a formal RFI. Twelve tenders followed.
  • Tender documents: a full RFT suite structured around criteria A to F, so tenders could be compared like for like.
  • Publication and clarifications: published on eTenders and TED with a 33-day tender period. Two tranches of clarifications, 17 responses in all, each risk-assessed and issued to every tenderer at once.
  • Evaluation: a briefed panel, conflict declarations and moderated scoring at sub-criterion level, with a rationale for every score. Several tenders contained AI-generated content, and Bidable advised the panel during evaluation on how to assess it, so marks went only to responses that met the stated requirements.
  • Award and close-out: outcome letters with a criterion-by-criterion comparison, and two debriefs. A process audit report and pre-contract-award certificate went to the Accounting Officer.

A close finish, handled

The two leading tenders were 1.29 marks apart. A scored risk log with named owners, moderated rationale for every mark and letters that set out the comparison criterion by criterion meant the result held without complaint.

The result

About 14 weeks from engagement to audit report, with no slippage and no challenge. The audit report has since been used for the academy’s Regulation 84 reporting, and the requirements, score sheet and competition rules were handed over for its next competition.

Running a competition?

Tell us what you're buying and when the notice needs to go out.

Talk to Tony