A local authority, for four regional offices

A website and reporting tool for four regional public offices

A county council needed a new website and a reporting tool for thousands of actions, on behalf of four regional offices and with one small team. Bidable acted as its procurement function.

The brief

Four regional public offices needed a new shared website and a tool to report on thousands of actions. A county council procured it on their behalf, with input from all four offices and a communications working group, and asked Bidable to run the procurement.

What Bidable did

  • Needs and options: a workshop with the council, the four regional leads and the working group; an audit of the existing site; off-the-shelf against custom, three reporting-tool architectures and a three-year total-cost-of-ownership model, ending in a signed-off options report.
  • Tender documents: a technology-neutral specification with a capability compliance matrix; accessibility (WCAG 2.2 AA), GDPR and EEA-hosting requirements; award criteria, evaluation templates and a pricing schedule; intellectual-property, source-code and escrow clauses.
  • Green Public Procurement: criteria under OGP Circular 20/2019, with an environmental policy, renewable EEA hosting and performance engineering mandatory, and a carbon budget per page view, with a plan to reduce it, scored.
  • Publication and evaluation: published on eTenders, with clarifications answered to every candidate at once and logged. Seventeen tenders were received. Bidable chaired a briefed panel as a non-scoring member, with a rationale for every sub-criterion, cost-of-ownership evaluation and a sensitivity check on the ranking.
  • Award and contract: letters to all 17 tenderers with the scoring rationale, a voluntary standstill, then a contract finalised with IP, source-code access and data-portability terms, a supplier kick-off and an audit report.

Leaving the team stronger

The panel were not procurement specialists, so they had a half-day briefing before any tender was opened: the ground rules, conflict-of-interest declarations and the standard for scoring rationale. The evaluation templates, compliance matrix and cost model are reusable by all four offices. A handover note on roles, escalation and change control meant the contract was managed in-house from day one.

The result

All deliverables were completed and 17 tenders evaluated, with an award and no challenge, within the fixed fee.

Running a competition?

Tell us what you're buying and when the notice needs to go out.

Talk to Tony